VA Sited Only
January to December
5 years
Facilities that are on production estimates on GATS do not qualify.
VA-######-SUN-D
VA-######-WND-D
VA-######-OBG-D
Solar, Wind, Anaerobic Digester
WND or OBG = less than or equal to 1MWac
SUN (behind the meter)= less than or equal to1.2MW DC
Year |
ACP |
% Small Distributed |
---|---|---|
2021 |
$75.00 |
1.00% |
2022 |
$75.75 |
1.00% |
2023 |
$76.50 |
1.00% |
2024 |
$77.27 |
1.00% |
2025 |
$78.04 |
1.00% |
2026 |
$78.82 |
1.00% |
2027 |
$79.61 |
1.00% |
2028 |
$80.41 |
1.00% |
2029 |
$81.21 |
1.00% |
2030 |
$82.02 |
1.00% |